IDENTIFICATION OF SITES
For any project
Nodal Agency would get the pre-feasibility reports prepared and then
offer site to the Developer. Projects can also be identified by
Developer(s) on their own, provided they are not in conflict with the
planned/alloted project of Government and irrigation/drinking water plan
of State Govt., and may approach the Nodal Agency for allotment. Nodal
Agency would get the permission/NOCs required from other department.
-
APPLICATION
AND PROCESSING FEE
A non refundable
application fee of Rs. 5/- per KW subject to a minimum of Rs. 10,000/-
will be charged from each applicant entrepreneur enterprise. Applicant
should submit two sets of pre-feasibility report based on scientifically
collected and factual data obtained from recognized sources along with
processing fee @ Rs. 25/- per KW subject to a minimum of Rs. 25,000/- to
be paid while applying for the project. Processing fee would be returned
if the site is not alloted ao the applicant.
-
ELIGIBILITY
CONDITIONS AND BASIS OF ALLOTMENT
Criteria for the award of sites by the Nodal Agency
would be as follows :
4.1 Applicant should be a citizen of India. In case the applicant is a
company, the company must be registered in India.
4.2 Applicant/Company should have previous experience and should be
technically sound and economically viable unit.
4.3 If the applicant/company shall be providing benefits of the plant
to unelctrified villages and the scheme envisages wheeling for this
purpose, preference shall be given to such applicant/company.
4.4 In case of multiple response for a given site invited by CREDA, the
award of site shall be done according to merit list prepared on the
basis of criteria given above.
4.5 In case of multiple response to sites selected by the applicants
themselves, the allotment shall be on "first come first served" basis.
-
WHEELING OF
ELECTRICITY
The entrepreneur can
wheel electricity produced at the power plant to his unit or that of a
third party or sister concern using the grid of the CSEB. Wheeling
charge shall be fixed as per policy of CSEB. In case the purchaser unit
is out side the state, wheeling charges shall be decided by the SEBs of
two states.
-
SALE OF
EXCESS POWER TO CSEB
CSEB shall
mandatorily buy the excess power after actual captive consumption by the
Entrepreneur or sale to third party/sister unit. The CSEB will buy this
excess power @ Rs. 2.25 per unit. The Government may revise this rate
from time to time.
-
EXPENDITURE
ON GRID INTERFACE / TRANSMISSION LINE
The expenditure
required for evacuation of power like grid interfacing equipment and
transmission line shall be borne by the Entrepreneur if the transmission
line is up to a distance of 2 km. For distances exceeding 2 km, the
expenditure on laying of transmission lines shall be shared equally by
the Entrepreneure & CSEB. However cost sharing by CSEB will be limited
up to a max. distance of 5 km. Laying of the transmission line shall be
done by CSEB.
-
WATER ROYALTY
Water royalty will be payable to Water Resources Department, Govt. of
Chhattisgarh at rates prescribed by that department from time to time.
-
ELECTRICITY
DUTY
No electricity duty shall be payable for five years from the date of
commissioning the SHP installed as the NCE policy of the state announced
vide its circular No. 38 dated 08.04.2002.
-
ALLOTMENT OF
LAND
A ward of land shall be done by the district / division / state
level committee / board constituted under the C.G. Industrial Investment
Promotion Act 2002.
-
TIME LIMIT FOR
EXECUTION OF THE PROJECT
11.1 The entrepreneur shall execute the project within the maximum
period of 3 years from the date of approval of the detailed project
report (DPR) submitted by him.
11.2 Time limits for various stages of the project shall be set by
CREDA at the time of approval of the DPR.
11.3 CREDA may cancel the allotment of site in case of non execution of
the project within time limits bet for various stages of the project or
due to the failure to make the plant operational within a period of 3
years from the approval of the DPR. CREDA may increase the time limit(s)
in case the delay is due to unavoidable circumstance.
-
TRANSFER OF
ALLOTMENT
The allottee cannot transfer the site awarded to him. In case
allottee is a company, the actual portion of the promoter equity shall
remain non transferable. After commissioning of the project the system
can be transferred only with the prior permission of Nodal Agency.
-
INTER-DEPARTMENTAL
CO-ORDINATION
Inter-Departmental co-ordination shall be done by the district /
divisional / state level committee / board constituted under the
Chhattisgarh Industrial Investment Promotion Act 2002.
-
The policy directives
shall be in force for a period of 5 years.